A family of six in a three bedroom brick veneer home in Sydney's north west need more space. After a frustrating three year journey looking at a renovation, we have come to the conclusion that a knock down rebuild is our best option.


Tuesday 18 April 2017

A simple tapware upgrade with an Epic cost

Eden Brae's standard tapware range across their Prestige series homes is Dorf's Jovian range. One of the challenges with the Home Options process is that the full range was not on display. After visiting a number of different showrooms, we decided that we wanted to change a number of items from Dorf's Jovian range to the Dorf Epic range. The Epic range maintains square angles but is a little softer and cleaner. We found the Jovian range a little chunky for our taste.

Dorf Jovian v Epic (images from Dorf website)


To get a rough idea of the potential cost change, we did a calculation using the recommended retail prices (RRP) published on the Dorf website. Seemed reasonable enough. Based on the unit cost difference and the quantities required, we calculated an overall cost increase of $203.00 to switch ranges. Note: this excluded basin mixers as we have selected a mixer from Astra Walker.

When the costing came back from Cook's Plumbing Supplies, the figure was a whopping $2,068.19! That is a little over 1000% more!! For example, the RRP difference between the wall bath mixers is $5.00 online, but the cost increase from Cook's is $257.27. Really!

Now I understand that Eden Brae and/or Cook's Plumbing have no doubt done a great deal with Dorf on the Jovian range for Eden Brae's Prestige series homes but that cost increase is truly "epic".

We queried it with Cook's Plumbing. The explanation was that their pricing is not RRP and that the pricing on Dorf's Jovian range is the result of a bulk discount to Eden Brae. Sounds reasonable but surely does not explain the huge difference. Our contract says the builders margin is 20% but with no transparency, the consumer is left with no option but to trust the builder.

This small example does show very powerfully just how costly upgrades can be.

6 comments:

  1. When is the Site start date?

    ReplyDelete
    Replies
    1. Eden Brae should be lodging our DA in the next week, so I would imagine we would be starting in about 3 months. No official start date yet.

      Delete
  2. Good luck with the build. I too am currently in the process of doing a KDR with Eden Brae. We are in the colour selection stage. Still a long way to go.

    ReplyDelete
  3. All the best Anna. Not that far behind us.

    ReplyDelete
  4. Hi Leo,

    How are things going with the build? We are waiting for council approval. It seems to be taking forever. Well, we have to be patient I guess. Now have to find a place to rent and move.

    Good luck with the progress. Anna